A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search
作者:
Highlights:
•
摘要
Decisions concerning a project’s expedition, traditionally involved considerations regarding time and cost tradeoff. It was recently suggested that the quality of a project should also be taken into considerations. In this paper, we propose a meta-heuristic solution procedure for the discrete time, cost and quality tradeoff problem. This problem involves the scheduling of project activities in order to minimize the total cost of the project while maximizing the quality of the project and also meeting a given deadline. We apply a so called electromagnetic scatter search to solve this problem. In this process, we initially generate a population of feasible solutions. In so doing, we use frequency memory to well sample the feasible region. A number of these solutions are then selected and improved locally. The improved solutions are then combined to generate new set of solutions. The combination process utilizes attraction–repulsion mechanisms borrowed from the electromagnetism theory. The whole process is stopped when no significant improvement in the set of solutions are observed. The validity of the proposed solution procedure is demonstrated, and its applicability is tested on a randomly generated large and complex problem having 19,900 activities.
论文关键词:Project management,Discrete time,Cost and quality problem,Scatter search,Electromagnetism theory
论文评审过程:Available online 16 February 2007.
论文官网地址:https://doi.org/10.1016/j.amc.2007.01.100