Single-machine group scheduling problems with deteriorated and learning effect

作者:

Highlights:

摘要

In many realistic situation, a job processed later consumes more time than the same job when it is processed earlier, this phenomenon is known as deteriorated effect. The skills of workers continuously improve when repeating the same or similar tasks, this phenomenon is as the “learning effect” in the literature. However, most studies considering the deteriorated and learning effect ignore the fact that production efficiency can be increased by grouping various parts and products with similar designs and/or production processes. This phenomenon is known “group technology” in the literature. In this paper, we propose a new group scheduling with deteriorated and learning model where the learning effect not only depends on job position, but also depends on the group position; the deteriorated effect depends on its starting time of the job. We then show that the single-machine makespan and the total completion time problems remain polynomial optimal solvable under the proposed model. In addition, we show the maximum lateness have a polynomial optimal solution under certain agreeable restriction.

论文关键词:Single-scheduling,Group technology,Deteriorated and learning effect,Makespan,Total completion time,Maximum lateness

论文评审过程:Available online 10 February 2010.

论文官网地址:https://doi.org/10.1016/j.amc.2010.02.018