Comments on “A bicriteria flowshop scheduling problem with setup times”
作者:
Highlights:
•
摘要
The aim of this paper is to point out that the integer programming model proposed by Eren and Güner [T. Eren, E. Güner, A bicriteria flowshop scheduling problem with setup times, Appl. Math. Comput. 183 (2006) 1292–1300] is incorrect. We propose a new integer programming model for the same scheduling problem based on their model.
论文关键词:Flowshop scheduling,Bicriteria,Setup time,Integer programming
论文评审过程:Available online 3 February 2011.
论文官网地址:https://doi.org/10.1016/j.amc.2011.01.101