Modeling stochastic project time–cost trade-offs with time-dependent activity durations
作者:
Highlights:
•
摘要
In real-life projects, both the trade-off between the project cost and the project completion time, and the uncertainty of the environment are considerable aspects for decision-makers. Moreover, in some projects, activity durations show their complexity with time-dependence as well as randomness. In this paper, a stochastic time-dependent time–cost trade-off problem is introduced. To meet different management requirements, three stochastic time–cost trade-off models are built. The proposed models are dealt with an intelligent algorithm combining stochastic simulations and genetic algorithm, where stochastic simulation technique is employed to estimate random functions and genetic algorithm is designed to search optimal schedules under different decision-making criteria. Finally, some numerical experiments are given to illustrate the algorithm effectiveness.
论文关键词:Time-dependent time–cost trade-off,Stochastic programming,Stochastic simulation,Genetic algorithm
论文评审过程:Available online 26 March 2012.
论文官网地址:https://doi.org/10.1016/j.amc.2012.03.035