A bi-objective flexible flow shop scheduling problem with machine-dependent processing stages: Trade-off between production costs and energy consumption
作者:
Highlights:
• Machine-dependent processing stages is investigated as a realistic condition in flexible flow shop scheduling problem.
• A novel bi-objective optimization model is developed to formulate the considered problem and to make a trade-off between energy consumption and production costs.
• A new solution approach is proposed based on non-dominated sorting genetic algorithm (NSGA-II) to solve the problem.
摘要
•Machine-dependent processing stages is investigated as a realistic condition in flexible flow shop scheduling problem.•A novel bi-objective optimization model is developed to formulate the considered problem and to make a trade-off between energy consumption and production costs.•A new solution approach is proposed based on non-dominated sorting genetic algorithm (NSGA-II) to solve the problem.
论文关键词:Scheduling,Flexible flow shop,Machine-dependent processing stages,Unrelated parallel machines,Energy consumption,Production costs
论文评审过程:Received 22 April 2020, Revised 7 July 2020, Accepted 12 July 2020, Available online 23 July 2020, Version of Record 23 July 2020.
论文官网地址:https://doi.org/10.1016/j.amc.2020.125533