Information Systems implementation failure: Insights from prism
作者:
Highlights:
•
摘要
This paper develops a theoretical framework and empirical formulation for describing and analyzing the information systems (IS) implementation process. Here, the sequential mapping of project events is integrated with the ‘Exchange Relations’ model of IS failure that identifies evolving recursive interactions. Three major IS implementation components are considered: the project organization, the information system and its supporters. Our model, referred to as process recursive interactive systems model (PRISM), demonstrates antecedent conditions, critical events and outcomes over the course of an IS implementation project lifecycle. It acts as a theoretical lens to make sense of the process where analysts may utilize PRISM in post-mortem analyses to diagnose the issues surrounding IS development and devise useful management strategies for any future system implementation. PRISM is formulated and illustrated within a structured case study of implementing an enterprise resource planning system (ERP) project. The contribution of the research is to enable formal analysis of critical incidents and their relations between preceding events and consequences which provide insights into potential project success or failure. It is believed that the findings will be of benefit to both academics and practitioners engaged in the complexities of ERP implementation.
论文关键词:IS implementation,ERP,Failure,Process,Structured case analysis
论文评审过程:Available online 29 May 2008.
论文官网地址:https://doi.org/10.1016/j.ijinfomgt.2007.07.001