Condition evaluation of existing reinforced concrete bridges using fuzzy based analytic hierarchy approach
作者:
Highlights:
•
摘要
There is an urgent need for a systematic methodology for condition assessment of the bridges because the old bridges of most of the countries are inadequate to carry current-day traffic and satisfy the present codal provisions and even in newer bridges, deterioration caused by unforeseen service condition and deferred maintenance is of great concern. In view of this, an attempt has been made in this study to develop a systematic procedure and formulations for condition evaluation of existing bridges using Analytic Hierarchy Process in a fuzzy environment. Analytic Hierarchy Process (AHP) is an efficient decision making tool for complicated problems with multiple evaluation criteria and uncertainty. Fuzzy logic approach has been used to take care of the uncertainties and imprecision in the bridge inspector’s observations. In this paper, first, a methodology has been proposed for condition ranking of number of reinforced concrete (RC) bridges. Then, based on the results obtained from prioritization, rating of the most deserved bridge has been carried out using MADM based fuzzy logic. Computer programs have been developed based on the formulations presented in this paper for evaluating condition of existing bridges and the details are presented in the paper. The methodology and its application are demonstrated through a case study. This methodology would certainly help the engineers and policy makers concerned with bridge management to overcome the problem related to prioritization and decision on funding related to rehabilitation of bridges.
论文关键词:Bridge elements,Condition rating,Fuzzy synthesis,Multi-Attributive Decision Making,Priority ranking
论文评审过程:Available online 8 August 2007.
论文官网地址:https://doi.org/10.1016/j.eswa.2007.08.017