The correct solution procedure on the replenishment run time problem with machine breakdown and failure in rework for supply chain management

作者:

Highlights:

摘要

Recently, Lin and Chiu [Lin, H. D., & Chiu, Y. S. P. (2012). Note on “Replenishment run time problem with machine breakdown and failure in rework. Expert Systems with Applications, ] show that the long-run average production-inventory costs per unit time is a convex function. The main purpose not only reveals that their cost function is not a convex function but also presents the correct solution procedure to locate the optimal solution for Lin and Chiu (2012).

论文关键词:Optimization,Calculus,Replenishment run time,Breakdown

论文评审过程:Available online 23 July 2012.

论文官网地址:https://doi.org/10.1016/j.eswa.2012.07.027