Construction scheduling using Genetic Algorithm based on Building Information Model

作者:

Highlights:

• We have previously developed an algorithm that reads the BIM.

• It also calculates the structural dependencies of the elements and stores them in a matrix.

• We demonstrated how this matrix can be used for developing construction schedules.

• We showed how functions of the GA should be developed for the purpose of this research.

• The entire algorithm is capable of generating structurally stable project schedules.

摘要

•We have previously developed an algorithm that reads the BIM.•It also calculates the structural dependencies of the elements and stores them in a matrix.•We demonstrated how this matrix can be used for developing construction schedules.•We showed how functions of the GA should be developed for the purpose of this research.•The entire algorithm is capable of generating structurally stable project schedules.

论文关键词:Construction project schedule,Building Information Model,Genetic Algorithm,Stability relations

论文评审过程:Available online 9 June 2014.

论文官网地址:https://doi.org/10.1016/j.eswa.2014.05.047