Generating project risk response strategies based on CBR: A case study

作者:

Highlights:

• A new pragmatic CBR-based method for generating project risk response strategies is proposed.

• The most similar historical cases can be retrieved using the method.

• The inapplicable strategies are revised to support the generation of the candidate strategy set.

• The desirable project risk response strategies are generated through the expert’s evaluations.

• Case problem on risk response of the subway project is solved based on this study.

摘要

•A new pragmatic CBR-based method for generating project risk response strategies is proposed.•The most similar historical cases can be retrieved using the method.•The inapplicable strategies are revised to support the generation of the candidate strategy set.•The desirable project risk response strategies are generated through the expert’s evaluations.•Case problem on risk response of the subway project is solved based on this study.

论文关键词:Project risk management,Risk response,Subway project,Case-based reasoning,Similarity

论文评审过程:Available online 24 November 2014.

论文官网地址:https://doi.org/10.1016/j.eswa.2014.11.034