A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects
作者:
Highlights:
• Using evidential reasoning as the multi-criterion decision making (MCDM) approach.
• A comprehensive framework to integrate MCDM methods with optimization techniques.
• Using MOGA with NSGA-II to solve discrete time–cost–quality trade-off problem.
• Determining the weights of the objectives with Shannon’s Entropy technique.
• Obtaining all the Pareto solutions for the 18-activity network benchmark example.
摘要
•Using evidential reasoning as the multi-criterion decision making (MCDM) approach.•A comprehensive framework to integrate MCDM methods with optimization techniques.•Using MOGA with NSGA-II to solve discrete time–cost–quality trade-off problem.•Determining the weights of the objectives with Shannon’s Entropy technique.•Obtaining all the Pareto solutions for the 18-activity network benchmark example.
论文关键词:Discrete time–cost–quality trade-off,Shannon’s entropy,Multi-criterion decision-making,Evidential reasoning,Multi-objective optimization,NSGA-II,Construction projects
论文评审过程:Available online 22 November 2014.
论文官网地址:https://doi.org/10.1016/j.eswa.2014.11.032