Hybrid stage shop scheduling

作者:

Highlights:

• Model from real case with multifunctional machines/operators.

• Splitting and overlapping operations by multi-resource on the same job/product.

• Mixed shop relations with undefined precedence constraints and their rules deployment.

• Resource (hybrid), operation (planning) and routing (scheduling) flexibility.

• Digraph approach, MILP, theory, O(resources × jobs2) heuristics and case study.

摘要

•Model from real case with multifunctional machines/operators.•Splitting and overlapping operations by multi-resource on the same job/product.•Mixed shop relations with undefined precedence constraints and their rules deployment.•Resource (hybrid), operation (planning) and routing (scheduling) flexibility.•Digraph approach, MILP, theory, O(resources × jobs2) heuristics and case study.

论文关键词:Manufacturing systems,Planning/scheduling integration,Mixed shop scheduling,Nonlinear routing,Resource flexibility

论文评审过程:Available online 8 January 2015.

论文官网地址:https://doi.org/10.1016/j.eswa.2014.12.050