Priority-based constructive algorithms for scheduling agile earth observation satellites with total priority maximization
作者:
Highlights:
• We study an Earth observation scheduling problem from China’s satellite platform.
• We develop priority-based indicators based on a cost-benefit analysis method.
• We employ a sequential construction procedure to generate feasible solutions.
• We evaluate the performance of the proposed algorithms in various scenarios.
摘要
•We study an Earth observation scheduling problem from China’s satellite platform.•We develop priority-based indicators based on a cost-benefit analysis method.•We employ a sequential construction procedure to generate feasible solutions.•We evaluate the performance of the proposed algorithms in various scenarios.
论文关键词:Agile earth observation satellite,Scheduling,Constructive algorithm,Ant colony optimization,Heuristic
论文评审过程:Received 24 October 2014, Revised 19 December 2015, Accepted 20 December 2015, Available online 7 January 2016, Version of Record 23 January 2016.
论文官网地址:https://doi.org/10.1016/j.eswa.2015.12.039