A two-stage adaptive fruit fly optimization algorithm for unrelated parallel machine scheduling problem with additional resource constraints

作者:

Highlights:

• A two-stage knowledge-based FOA for RCUPMSP.

• Several properties for RCUPMSP.

• Search manners with the guidance of knowledge.

• Parameter setting and effectiveness demonstration.

摘要

•A two-stage knowledge-based FOA for RCUPMSP.•Several properties for RCUPMSP.•Search manners with the guidance of knowledge.•Parameter setting and effectiveness demonstration.

论文关键词:Fruit fly optimization algorithm,Unrelated parallel machine scheduling,Resource constraint,Knowledge

论文评审过程:Received 22 February 2016, Revised 6 August 2016, Accepted 7 August 2016, Available online 8 August 2016, Version of Record 12 August 2016.

论文官网地址:https://doi.org/10.1016/j.eswa.2016.08.039