GRASP algorithm for the unrelated parallel machine scheduling problem with setup times and additional resources
作者:
Highlights:
• We study a parallel machine scheduling problem.
• Setups need additional resources, such as workers.
• A GRASP algorithm is proposed.
• Large instances can be solved in short cpu time.
摘要
•We study a parallel machine scheduling problem.•Setups need additional resources, such as workers.•A GRASP algorithm is proposed.•Large instances can be solved in short cpu time.
论文关键词:Unrelated parallel machines,Scheduling,Sequence dependent setup times,Makespan,Additional resources,GRASP
论文评审过程:Received 3 December 2018, Revised 16 September 2019, Accepted 17 September 2019, Available online 18 September 2019, Version of Record 26 September 2019.
论文官网地址:https://doi.org/10.1016/j.eswa.2019.112959