Cost-sensitive learning classification strategy for predicting product failures
作者:
Highlights:
• Modified cost-sensitive classification strategy for an industrial problem.
• Decision rule for going through or skipping elements of last quality control stage.
• Trade-off problem between cost and quality.
• Modified strategy can also be applied on problems without an associated cost.
摘要
•Modified cost-sensitive classification strategy for an industrial problem.•Decision rule for going through or skipping elements of last quality control stage.•Trade-off problem between cost and quality.•Modified strategy can also be applied on problems without an associated cost.
论文关键词:Cost-sensitive learning,Predictive manufacturing,Failure prediction,Imbalance classification,Genetic algorithm,Voronoi diagram
论文评审过程:Received 28 September 2019, Revised 14 January 2020, Accepted 10 June 2020, Available online 18 June 2020, Version of Record 18 July 2020.
论文官网地址:https://doi.org/10.1016/j.eswa.2020.113653