Minimizing activity exposures in project scheduling under uncertainty

作者:

Highlights:

• A due-date achievement model based on activities exposure level is introduced.

• The resource-constrained scheduling under uncertain activity durations is studied.

• The optimal schedule can be computed by solving a mixed integer linear program.

• Two versions of models are developed to cater for different data assumptions.

摘要

•A due-date achievement model based on activities exposure level is introduced.•The resource-constrained scheduling under uncertain activity durations is studied.•The optimal schedule can be computed by solving a mixed integer linear program.•Two versions of models are developed to cater for different data assumptions.

论文关键词:Project scheduling under uncertainty,Uncertain activity durations,Due-date achievement,Robust optimization

论文评审过程:Received 14 August 2019, Revised 14 January 2021, Accepted 16 January 2021, Available online 26 January 2021, Version of Record 24 February 2021.

论文官网地址:https://doi.org/10.1016/j.eswa.2021.114635