Energy-cost-aware resource-constrained project scheduling for complex product system with activity splitting and recombining
作者:
Highlights:
• The energy-oriented activity splitting and recombining proactively.
• Dynamic fuzzy clustering strategy for the time-varying resource consumption level.
• Metaheuristic solution for project scheduling with different granularity levels.
摘要
•The energy-oriented activity splitting and recombining proactively.•Dynamic fuzzy clustering strategy for the time-varying resource consumption level.•Metaheuristic solution for project scheduling with different granularity levels.
论文关键词:Project scheduling,Complex product system,Activity splitting and recombining,Fuzzy clustering,Improved NSGA-II
论文评审过程:Received 19 July 2020, Revised 31 December 2020, Accepted 16 February 2021, Available online 23 February 2021, Version of Record 11 March 2021.
论文官网地址:https://doi.org/10.1016/j.eswa.2021.114754