Weighted earliness/tardiness parallel machine scheduling problem with a common due date
作者:
Highlights:
• Effective solution construction and improvement heuristics are proposed.
• The V-Shaped property and optimized start times of machines are considered.
• Balanced workload strategy is better than balanced number of jobs strategy.
• Local search according to the V-shaped property increases solution quality.
• Commercial solver is combined with solution algorithms to optimize start times.
摘要
•Effective solution construction and improvement heuristics are proposed.•The V-Shaped property and optimized start times of machines are considered.•Balanced workload strategy is better than balanced number of jobs strategy.•Local search according to the V-shaped property increases solution quality.•Commercial solver is combined with solution algorithms to optimize start times.
论文关键词:Parallel machine,Common due date,Earliness,Tardiness,Heuristic,V-shaped
论文评审过程:Received 21 September 2020, Revised 6 July 2021, Accepted 12 September 2021, Available online 21 September 2021, Version of Record 24 September 2021.
论文官网地址:https://doi.org/10.1016/j.eswa.2021.115916