Multi-mode project portfolio selection and scheduling in a build-operate-transfer environment
作者:
Highlights:
• Fuzzy optimization of project portfolio selection and scheduling problem.
• Mathematical modeling based on BOT contract assumptions.
• Maximizing portfolio NPV considering multi-mode projects.
• Planning for attracting external capital and repayment installments.
摘要
•Fuzzy optimization of project portfolio selection and scheduling problem.•Mathematical modeling based on BOT contract assumptions.•Maximizing portfolio NPV considering multi-mode projects.•Planning for attracting external capital and repayment installments.
论文关键词:Project portfolio selection and scheduling,Fuzzy mathematical programming model,Multi-mode projects,Build-operate-transfer contracts
论文评审过程:Received 5 August 2021, Revised 16 September 2021, Accepted 19 October 2021, Available online 27 October 2021, Version of Record 13 November 2021.
论文官网地址:https://doi.org/10.1016/j.eswa.2021.116134