Energy-efficient project scheduling with supplier selection in manufacturing projects

作者:

Highlights:

• Studied a green RCPSP embedded with supplier selection plan for manufacturing.

• Developed a model with the objectives of minimization of makespan and green project indicators.

• Proposed a GA-based MA algorithm to solve the problem.

• Compare the performance of MA against NSGA-II and EP algorithms.

摘要

•Studied a green RCPSP embedded with supplier selection plan for manufacturing.•Developed a model with the objectives of minimization of makespan and green project indicators.•Proposed a GA-based MA algorithm to solve the problem.•Compare the performance of MA against NSGA-II and EP algorithms.

论文关键词:Project scheduling in manufacturing,Supplier,Green,Memetic algorithm,Multi-objective

论文评审过程:Received 17 October 2020, Revised 23 September 2021, Accepted 23 December 2021, Available online 29 December 2021, Version of Record 4 January 2022.

论文官网地址:https://doi.org/10.1016/j.eswa.2021.116446