A two-stage approach with softmax scoring mechanism for a multi-project scheduling problem sharing multi-skilled staff

作者:

Highlights:

• A two-stage model is established for the problem studied in this paper.

• A two-stage approach with softmax scoring mechanism (TSA-SSM) is developed.

• TSA-SSM performs better than compared methods for most of the problem subsets.

• TSA-SSM is further verified by solving the de-coupled problems.

摘要

•A two-stage model is established for the problem studied in this paper.•A two-stage approach with softmax scoring mechanism (TSA-SSM) is developed.•TSA-SSM performs better than compared methods for most of the problem subsets.•TSA-SSM is further verified by solving the de-coupled problems.

论文关键词:Multi-project scheduling,Multi-skilled staff,Two-stage approach,Softmax scoring mechanism,Greedy assignment strategy

论文评审过程:Received 26 June 2021, Revised 19 April 2022, Accepted 25 April 2022, Available online 9 May 2022, Version of Record 13 May 2022.

论文官网地址:https://doi.org/10.1016/j.eswa.2022.117385