COVID-19 medical waste transportation risk evaluation integrating type-2 fuzzy total interpretive structural modeling and Bayesian network
作者:
Highlights:
• The IT2FNS-TISM is used to analyze interrelationships among risks.
• A defuzzified relationship matrix calculation method is proposed in IT2FNS-TISM.
• The priority of identified risk is determined using hybrid fuzzy BN method.
• The validity of method is tested by a real COVID-19 medical waste transportation.
摘要
•The IT2FNS-TISM is used to analyze interrelationships among risks.•A defuzzified relationship matrix calculation method is proposed in IT2FNS-TISM.•The priority of identified risk is determined using hybrid fuzzy BN method.•The validity of method is tested by a real COVID-19 medical waste transportation.
论文关键词:Risk evaluation,Medical waste transportation,Interval type-2 fuzzy set,Total interpretive structural modeling,Bayesian network
论文评审过程:Received 6 April 2022, Revised 30 July 2022, Accepted 18 September 2022, Available online 24 September 2022, Version of Record 28 September 2022.
论文官网地址:https://doi.org/10.1016/j.eswa.2022.118885