A computational evaluation of constructive and improvement heuristics for the blocking flow shop to minimise total flowtime
作者:
Highlights:
• We address the blocking flow shop to minimise total flowtime.
• We conduct a comprehensive evaluation of a total of 35 heuristics.
• We propose an efficient constructive heuristic using a beam-search-based approach.
• We compare the proposal with the best-so-far algorithms for the problem.
摘要
•We address the blocking flow shop to minimise total flowtime.•We conduct a comprehensive evaluation of a total of 35 heuristics.•We propose an efficient constructive heuristic using a beam-search-based approach.•We compare the proposal with the best-so-far algorithms for the problem.
论文关键词:Scheduling,Flowshop,Blocking,Heuristics,PFSP,Total flowtime,Computational evaluation,Beam search
论文评审过程:Received 9 March 2016, Revised 24 May 2016, Accepted 27 May 2016, Available online 30 May 2016, Version of Record 7 June 2016.
论文官网地址:https://doi.org/10.1016/j.eswa.2016.05.040